Calibrators
Multi-function and dry-block temperature calibrators, for checking the instruments everything else depends on.
- Multi-function sourcing and measuring
- Dry-block temperature
- Traceable calibration available
Site work and bench work
Calibrators, clamp testers, earth kits, safety testers, mechanical test, power quality and substation diagnostics. Eight sub-categories covering the installation, the machines on it and the instruments you check them with.
+44 (0) 203 093 0914Pick a type on the left, or read them all.
8 of 8 sub-categories
Tell us what you are testing and where, and we will tell you what fits and what rating you need.
Multi-function and dry-block temperature calibrators, for checking the instruments everything else depends on.
Ground loop resistance and leakage current without breaking the bond or driving a stake.
AC and DC current measurement with true RMS, read through the conductor rather than in series with it.
Earth resistance, soil resistivity and earth voltage, by the stake methods that give a true figure.
Insulation resistance, hipot and ground bond, for proving a product or an installation is safe to energise.
Tachometers, vibration, alignment and balancing, for the rotating half of a plant room.
Harmonics, flicker, transients and long-term logging, for faults that only appear when nobody is watching.
Turns ratio, winding resistance, tan delta and primary current injection, for transformers, breakers and the assets around them.
Nothing matches that filter. Choose All to see them all.
Buying an instrument from us comes with the part that is harder to buy: knowing whether it is the right one.
Guidance on measurement categories, hipot and ground bond testing, and what the ratings actually mean for where you are working.
Try an instrument on your own installation before you commit to it.
From site-ready testers that live in a van to high-accuracy instruments that stay on a bench.
One year warranty, with UKAS or traceable calibration arranged at the time of order.
It follows where you measure rather than what you measure. CAT II for appliances and socket outlets, CAT III for distribution inside a building, CAT IV for the service entrance and anything outdoors. Match the voltage rating as well as the category: both have to cover you.
A clamp is fast and needs no stakes, which makes it the right tool on a bonded or meshed system where a return path already exists. Stake methods give a true soil and earth resistance, and are what you want on a new installation or wherever the loop can be opened.
Yes, UKAS or traceable calibration for most instruments. Tell us the instrument and whether you need it before delivery or on a cycle, and we will quote it with the turnaround.
Our engineers are happy to help with specifications, lead times and compatibility.
Call usWe respond within one business day · Monday to Friday, 9am to 5pm
Fill in the form and we will get back to you within one business day.
Ask us anything — sales, technical, or order related.
We never share your details. By sending, you agree to be contacted about your enquiry.